Oil tanker aux boilers: tests before cargo discharge
EL-0146 · Procedure · rating 0 · occurred 01 Aug 2022
Source: /cases/el-0146
Scope#
Before cargo discharge on an oil tanker, I test the auxiliary boilers so they keep working through the discharge: boiler water, controls, and the pumps under load. This applies to any boiler maker and model.
These are my own suggestions, not a fixed maker procedure. I give no limits or intervals; the only number here is the test load.
Safety#
- There are no special safety steps beyond normal practice.
- Follow the ship's own procedures and permits for work on boilers, burners and fuel systems.
- When you run a boiler in emergency mode or control the water level by hand, keep a person at the local gauge glass at all times.
- Do not bypass any boiler safety device or interlock during these tests.
Tools & parts#
- Water test kit for feedwater and boiler water (mainly chlorides).
- Cleaning materials for burners, igniters and flowmeters.
- No other tools or spare parts are needed for this list.
Steps#
Preparation
- Study the known failure history of your boiler model. Ask the crew about small problems they did not report.
- Give the control system extra attention. In my experience, faults in the control system cause the most trouble, since you cannot easily see them coming.
- Clean the burners and the igniters.
- Check that the feedwater control valves move smoothly and do not stick.
- On Aalborg boilers with screw-type flowmeters, clean the flowmeters. Most ships now use Coriolis-type flowmeters instead.
- In the days before discharge, do not start maintenance work that can wait.
- If the inert gas (IG) system is topped up before arrival, use that boiler running time to test and inspect the system.
Water and controls
- Test the feedwater and the boiler water in both boilers and in the cascade tank. Check mainly chlorides.
- If chlorides are high, first find the cause. Then repair or plug the leak, and blow down or replenish the boiler water as needed.
- Put each boiler controller (water level, air, fuel) in manual mode and check how it responds.
Load test
- Run both auxiliary boilers in parallel at
50 %load each. Run one cargo pump and use the steam dump (damping) valve. - During this test, run each feedwater pump on its own. Compare the discharge pressures and motor currents.
- Do the same for each boiler fuel oil supply pump.
- Run one boiler in emergency mode.
- Compare the remote water level reading with the local gauge (sight) glass.
- Control the water level by hand with the local boiler valves.
These tests use extra fuel. I accept that: lost hire time and a damaged company name after a boiler stop in discharge are far more expensive than that fuel.
Check after#
- Chlorides in both boilers and the cascade tank are acceptable, or the cause is found and repaired.
- All controllers respond correctly in manual mode.
- Each feedwater pump and fuel oil supply pump gives similar discharge pressure and motor current to its pair.
- The boiler runs in emergency mode.
- The remote water level reading agrees with the local gauge glass.
- I have no recorded result from a specific ship for these tests.