Oil tanker aux boilers: tests before cargo discharge

BoilerPumps

Contents
  1. Scope
  2. Safety
  3. Tools & parts
  4. Steps
  5. Check after
  6. Comments · 0

Scope#

Before cargo discharge on an oil tanker, I test the auxiliary boilers so they keep working through the discharge: boiler water, controls, and the pumps under load. This applies to any boiler maker and model.

These are my own suggestions, not a fixed maker procedure. I give no limits or intervals; the only number here is the test load.

Safety#

  • There are no special safety steps beyond normal practice.
  • Follow the ship's own procedures and permits for work on boilers, burners and fuel systems.
  • When you run a boiler in emergency mode or control the water level by hand, keep a person at the local gauge glass at all times.
  • Do not bypass any boiler safety device or interlock during these tests.

Tools & parts#

  • Water test kit for feedwater and boiler water (mainly chlorides).
  • Cleaning materials for burners, igniters and flowmeters.
  • No other tools or spare parts are needed for this list.

Steps#

Preparation

  1. Study the known failure history of your boiler model. Ask the crew about small problems they did not report.
  2. Give the control system extra attention. In my experience, faults in the control system cause the most trouble, since you cannot easily see them coming.
  3. Clean the burners and the igniters.
  4. Check that the feedwater control valves move smoothly and do not stick.
  5. On Aalborg boilers with screw-type flowmeters, clean the flowmeters. Most ships now use Coriolis-type flowmeters instead.
  6. In the days before discharge, do not start maintenance work that can wait.
  7. If the inert gas (IG) system is topped up before arrival, use that boiler running time to test and inspect the system.

Water and controls

  1. Test the feedwater and the boiler water in both boilers and in the cascade tank. Check mainly chlorides.
  2. If chlorides are high, first find the cause. Then repair or plug the leak, and blow down or replenish the boiler water as needed.
  3. Put each boiler controller (water level, air, fuel) in manual mode and check how it responds.

Load test

  1. Run both auxiliary boilers in parallel at 50 % load each. Run one cargo pump and use the steam dump (damping) valve.
  2. During this test, run each feedwater pump on its own. Compare the discharge pressures and motor currents.
  3. Do the same for each boiler fuel oil supply pump.
  4. Run one boiler in emergency mode.
  5. Compare the remote water level reading with the local gauge (sight) glass.
  6. Control the water level by hand with the local boiler valves.

These tests use extra fuel. I accept that: lost hire time and a damaged company name after a boiler stop in discharge are far more expensive than that fuel.

Check after#

  • Chlorides in both boilers and the cascade tank are acceptable, or the cause is found and repaired.
  • All controllers respond correctly in manual mode.
  • Each feedwater pump and fuel oil supply pump gives similar discharge pressure and motor current to its pair.
  • The boiler runs in emergency mode.
  • The remote water level reading agrees with the local gauge glass.
  • I have no recorded result from a specific ship for these tests.

Comments · 0

No comments yet.

Sign in to comment, vote and confirm fixes.Sign in