Log inJoin

Two-stroke main engine: jobs to do while stopped in port or at anchor

Main EngineBoilerMAN ES ME / MC

Notes#

This is my checklist of jobs to plan when the two-stroke main engine is stopped in port or at anchor and there is a good chance to do the work. It leaves out inspections that are due by running hours.

Jobs I plan for M/E standstill

  • Clean the exhaust gas boiler (economizer).
  • Clean the M/E scavenge air coolers with chemicals.
  • Inspect and clean the scavenge space. Clear the scavenge drain pipes.
  • MAN ES ME engines (electronically controlled): filter the oil with a Super Fine Filter (SFF).
  • MAN ES ME engines: check the nitrogen (N2) pressure in the HCU and HPS (hydraulic power supply) accumulators. Refill if needed.
  • MAN ES MC engines: check the N2 pressure in the Alpha Lubricator accumulators. Refill if needed.
  • Backflush the central coolers, if their performance shows it is needed.
  • Clean the fresh water generator, if its performance shows it is needed.

What this note doesn't cover

  • Intervals, N2 pressure values, chemicals or cleaning methods.
  • Step-by-step procedures and maker service letters.

This is general practice, not a specific fault. Use the maker's manuals for values and procedures.

Comments · 0

No comments yet.

Sign in to comment, vote and confirm fixes.Sign in