Condition based maintenance on tankers and gas carriers: examples

Main EnginePumpsMAN ES ME / MC

Notes#

Condition based maintenance (CBM) on tankers and gas carriers means working on equipment when its condition calls for it; these are the practical examples I use for the main engine, pumps and lube oil. Oil majors now expect CBM more and more. No fault case is described here.

What CBM means

  • The state of the equipment decides when work is done. A fixed calendar, as in planned maintenance, does not.

Main engine pistons: scavenge port inspection

  • MAN has a service letter on condition based piston overhaul for ME and MC engines. I have it referenced as SL207-483/HRR, but the file is named SL07-483.pdf. The two numbers do not match, and I do not know which one is correct.
  • The letter is written for containerships, bulk carriers and other ships with a similar trade pattern.
  • Main point of the letter: if the scavenge ports are inspected regularly, the time between piston overhauls can be made longer.
  • Scavenge space inspection on the ME is the oldest and most common form of CBM.
  • Measure the thickness of the cermet (ceramic-metal) coating during the inspection.
  • Overhaul the piston when the coating thickness falls below a set limit. I don't have the limit value.
  • This matters most on engines that burn low-sulphur fuel and on large-bore engines ("80 and above", no unit stated).

Lube oil analysis by an outside laboratory

An example schedule from a tanker. Each interval allows +1 month.

IntervalEquipment
Every 3 monthsMain engine, diesel generators 1/2/3, stern tube
Every 6 monthsSteering gear 1/2, forward and aft deck machinery
Every 12 monthsCargo oil pump turbines 1/2/3, hose handling cranes P/S, provision cranes P/S, valve remote control system, emergency diesel generator

I don't have the analysis limits.

Vibration analysis and infrared thermography

  • Used on motors, pumps and fans.
  • Specialists do the measurements at fixed intervals. The minimum is once every 5 years, before each drydock.
  • The specialists write a report. The superintendent then decides what to do.
  • Some tanker companies use vibration analysis to decide when ER pumps need overhaul. I don't know the exact method.

ME bearing wear monitoring

  • Measures engine bearing wear all the time, without contact.
  • It is usually fitted together with a water-in-oil sensor. This sensor gives an alarm when water content in the ME system oil is high.

Engine performance monitoring (ME and DGs)

  • Cylinder pressure sensors (Pmax, Pcomp, Pi) show engine performance and balance between cylinders. They are used on two-stroke and four-stroke engines.
  • On MAN ES engines, the MAN ES PMI system gives live cylinder pressure data and can correct the cylinder balance by itself.
  • More ships now also use live monitoring platforms, for example MAN ES CEON.

What this note doesn't cover

  • Cermet coating thickness limits.
  • Vibration alarm or acceptance levels, and lube oil analysis limits.
  • Any CBM procedure written for gas carriers only.

Comments · 0

No comments yet.

Sign in to comment, vote and confirm fixes.Sign in