Scope#
Most serious damage to an auxiliary diesel generator (D/G) comes a few hours after a general overhaul, usually from connecting rod or rod bolt failure; this is the checklist I use to prevent it. It applies when a D/G is close to the maker's limits and due for a general overhaul, and it is what I would brief the Chief Engineer on before the work and before putting the D/G back in service. It is not tied to an engine maker or model, and no real failure case is described.
From my own experience and from statistics I do not cite here:
- Most serious D/G damage happens a few hours after a general overhaul is finished.
- The usual cause is failure of the connecting rod or the connecting rod bolts. The broken parts then damage the crankshaft, the cylinder units and the engine block.
- The result is a long time out of service, lower safety, commercial loss, and a risk of crew injury from flying parts.
- I put the repair cost at about
300-500kand a planned overhaul at about25-30k(no currency given).
This is my own checklist, not a maker procedure.
Safety#
- A connecting rod failure can throw debris out of the engine. Crew near the D/G can be hurt.
- Hydraulic tightening tools work at high pressure. Use them only if they are in good condition (see step 1).
- Follow the maker's manual for all limits and tightening data. I give no values here.
Tools & parts#
- Hydraulic jacks, hydraulic pump, connectors and supports
- Extension screws
- Lifting gear and guide supports
- Honing tool
- Inside and outside micrometers
- Dye penetrant test kit
- New connecting rod bolts and nuts
- Connecting rod bearing shells (if replacement is needed)
- New lube oil for a full change
Steps#
- Before work starts, check that all special tools are in good condition: hydraulic jacks, pump, connectors, supports, extension screws, lifting gear, guide supports, honing tool and micrometers.
- If the design has serrations on the connecting rod big end, inspect them carefully. Do a dye penetrant test on them.
- Measure the ovality of the big-end bore correctly. Replace the connecting rod if it is out of limits.
- Measure the ovality of the crankpin correctly.
- Assess the connecting rod bearings properly. Replace them if needed.
- Fit the bearing shells and align them correctly.
- Tighten the rod bolts and nuts with the hydraulic tool exactly as the maker says: steps, angles, pre-tension, gaps and the specified pressure. Check that bolt elongation is within the maker's limits.
- Fit new connecting rod bolts and nuts at the overhaul. They are cheap, and new ones remove the risk of defects nobody has found.
- Change the full lube oil charge.
Check after#
- After the first running hours, check the hydraulic tightening pressure again. Do this after
50,100or200 h, as the maker requires. - Put marks on the nuts and the rod so you can see if any nut has turned.
- After the first running hours, open and inspect the crankcase.
- Check the temperature of the connecting rod bearings. I do not give a method for checking it or a limit to use.
I have no result from a specific overhaul to report.