Scope#

Most serious damage to an auxiliary diesel generator (D/G) comes a few hours after a general overhaul, usually from connecting rod or rod bolt failure; this is the checklist I use to prevent it. It applies when a D/G is close to the maker's limits and due for a general overhaul, and it is what I would brief the Chief Engineer on before the work and before putting the D/G back in service. It is not tied to an engine maker or model, and no real failure case is described.

From my own experience and from statistics I do not cite here:

  • Most serious D/G damage happens a few hours after a general overhaul is finished.
  • The usual cause is failure of the connecting rod or the connecting rod bolts. The broken parts then damage the crankshaft, the cylinder units and the engine block.
  • The result is a long time out of service, lower safety, commercial loss, and a risk of crew injury from flying parts.
  • I put the repair cost at about 300-500k and a planned overhaul at about 25-30k (no currency given).

This is my own checklist, not a maker procedure.

Safety#

  • A connecting rod failure can throw debris out of the engine. Crew near the D/G can be hurt.
  • Hydraulic tightening tools work at high pressure. Use them only if they are in good condition (see step 1).
  • Follow the maker's manual for all limits and tightening data. I give no values here.

Tools & parts#

  • Hydraulic jacks, hydraulic pump, connectors and supports
  • Extension screws
  • Lifting gear and guide supports
  • Honing tool
  • Inside and outside micrometers
  • Dye penetrant test kit
  • New connecting rod bolts and nuts
  • Connecting rod bearing shells (if replacement is needed)
  • New lube oil for a full change

Steps#

  1. Before work starts, check that all special tools are in good condition: hydraulic jacks, pump, connectors, supports, extension screws, lifting gear, guide supports, honing tool and micrometers.
  2. If the design has serrations on the connecting rod big end, inspect them carefully. Do a dye penetrant test on them.
  3. Measure the ovality of the big-end bore correctly. Replace the connecting rod if it is out of limits.
  4. Measure the ovality of the crankpin correctly.
  5. Assess the connecting rod bearings properly. Replace them if needed.
  6. Fit the bearing shells and align them correctly.
  7. Tighten the rod bolts and nuts with the hydraulic tool exactly as the maker says: steps, angles, pre-tension, gaps and the specified pressure. Check that bolt elongation is within the maker's limits.
  8. Fit new connecting rod bolts and nuts at the overhaul. They are cheap, and new ones remove the risk of defects nobody has found.
  9. Change the full lube oil charge.

Check after#

  1. After the first running hours, check the hydraulic tightening pressure again. Do this after 50, 100 or 200 h, as the maker requires.
  2. Put marks on the nuts and the rod so you can see if any nut has turned.
  3. After the first running hours, open and inspect the crankcase.
  4. Check the temperature of the connecting rod bearings. I do not give a method for checking it or a limit to use.

I have no result from a specific overhaul to report.