MAN ME: internal leak test on the hydraulic system
EL-0172 · Procedure · rating 0 · occurred 01 Sept 2022
Source: /cases/el-0172
Scope#
This procedure is for MAN ES main engines with electronic control (ME type). It covers the hydraulic power supply (HPS) pumps, the hydraulic cylinder units (HCU) and the safety and accumulator block.
The aim is to find where oil leaks inside the hydraulic system. You test one section at a time. For each section you record how long the pressure takes to rise and how long it takes to fall.
I share this method as a 2-page checklist. It is a blank form for recording times. It has no real fault case, no readings and no reference times. The only reply I got was a thank-you with no technical content.
Every step uses two measurements:
- Build-up time: the system is at
0 bar. Start one start-up pump. Record the time the system needs to reach the pressure setpoint. - Drop time: stop the start-up pump. Record the time the system pressure needs to fall to
50 bar.
Safety#
- My checklist gives no separate safety notes.
- To release pressure from an HCU block, open valve 420 first. Then open valve 421.
- After every step, set the system back to the preconditions.
Tools & parts#
- A watch, to time the pressure rise and fall.
- The 2-page test form, to record the times for each unit.
Steps#
Set these preconditions first. Set them again after every step:
- Close valve 420 on all HCU blocks.
- Remove plug J70 on all 3 ACUs.
- Run the lube oil pump.
- Switch on control air.
- Put both start-up pumps in Local mode.
Step 1 — HPS pumps (one pump at a time)
- Plug in J70 on ACU1. This sends HPS pump 1 to
0%swashplate. - Run one start-up pump until the system reaches the setpoint. Then stop the pump.
- Record the build-up time and the drop time.
- Set the system back to the preconditions.
- Do steps 6 to 9 again with J70 on ACU2 (pump 2). Then do them with J70 on ACU3 (pump 3).
Step 2 — HCU blocks (one block at a time)
My form has rows for HCU 1 to 6. This suggests it was made for a 6-cylinder engine. Test as many HCUs as your engine has.
- Open valve 420 on one HCU only.
- Run one start-up pump until the system reaches the setpoint. Then stop the pump.
- Record the build-up time and the drop time.
- Set the system back to the preconditions (valve 420 closed).
- Do steps 11 to 14 again on the next HCU. Continue until every HCU is tested.
Step 3 — Safety and accumulator block
- Open valve 316 on the safety and accumulator block. This is a tightness test for valve 310.
- Run one start-up pump until the system reaches the setpoint. Then stop the pump.
- Record the build-up time and the drop time.
- Set the system back to the preconditions.
Check after#
- Compare the times of all the units. My checklist does not say this in words, but the method depends on it.
- A pump, HCU or valve whose build-up time is clearly longer, or whose drop time is clearly shorter, than the others most likely has the internal leak.
- My checklist does not give the pressure setpoint value. It gives no acceptable times and no limit times.
- My checklist explains valves 310, 316, 420 and 421 only as far as written above.
- My checklist does not say what to do after you find a leaking unit. It gives no reference to MAN service letters.