Log inJoin
Search

Cases

0 rating0 commentsTwo-stroke main engine: jobs to do while stopped in port or at anchorKnowledgeMain Engine · MAN ES ME / MCThis is my checklist of jobs to plan when the two-stroke main engine is stopped in port or at anchor and there is a good chance to do the work. It leaves out inspections that are due by running…Anonymous · 4 y0 rating0 commentsMAN B&W ME: HPS pressure build-up time and decay checkKnowledgeMain Engine · MAN B&W MEOn a MAN B&W ME engine with one start-up pump running, I take an HPS pressure build-up time under 30 s as acceptable, and I also check the pressure decay time. The full maker requirements are in the…Anonymous · 3 y0 rating0 commentsMAN ME: internal leak test on the hydraulic systemProcedureMain Engine · MAN ES ME-type main engineThis procedure is for MAN ES main engines with electronic control (ME type). It covers the hydraulic power supply (HPS) pumps, the hydraulic cylinder units (HCU) and the safety and accumulator block.…Anonymous · 4 y