Log inJoin
Search

Cases

0 rating0 commentsOil tanker aux boilers: tests before cargo dischargeProcedureBoilerBefore cargo discharge on an oil tanker, I test the auxiliary boilers so they keep working through the discharge: boiler water, controls, and the pumps under load. This applies to any boiler maker…Anonymous · 4 y0 rating0 commentsAux boiler explosion: waxy MGO, then fan restart into a gassy furnace (Manhattan Bridge)IncidentBoiler · "" · Aux boiler emergency trip (Furnace flame-eye abnormal)A 13,900 TEU container ship was berthing at Felixstowe in winter. The auxiliary boiler (rotary cup burner) had been on MGO for three days for the ECA. It tripped four times between 17:30 and 19:51.…Anonymous · 8 y0 rating0 commentsLNG dual-fuel ship: how the fuel gas supply system worksKnowledgeMain EngineThe fuel gas supply system (FGSS) on an LNG dual-fuel ship controls boil-off gas pressure in the LNG fuel tanks and turns LNG into gas for the engines and boilers; its design is set mainly by the…Anonymous · 3 y0 rating0 commentsMAN B&W ES main engine: precautions for long low-load runningKnowledgeMain Engine · MAN B&W ESMAN Service Letter SL09-511/MTS gives 10% load as the lowest load for continuous running of a MAN B&W ES two-stroke main engine, and running in this range needs precautions. These are the precautions…Anonymous · 4 y