Search
Cases
Search cases
Clear
⌘K
All
6
Solved
0
Open
0
Troubleshooting
Incident analysis
Procedure
Knowledge
6 cases match
Equipment
All
Main Engine
Auxiliary Engine
Turbocharger
Boiler
Purifier
Compressed Air
Pumps
Fresh Water Generator
OWS & Bilge
Incinerator & Sewage
Refrigeration & HVAC
Steering Gear
Propulsion & Thrusters
Deck Machinery
Ballast System
Electrical
Automation / PLC
Navigation
Fire & Safety
Other
Sort
Best match
Newest first
Highest rated
Most confirmed
Recently updated
Apply
▲
0
rating
0
comments
MAN ME: internal leak test on the hydraulic system
Procedure
Main Engine
·
MAN ES ME-type main engine
This procedure is for MAN ES main engines with electronic control (ME type). It covers the hydraulic power supply (HPS) pumps, the hydraulic cylinder units (HCU) and the safety and accumulator block.…
Anonymous · 4 y
▲
0
rating
0
comments
Main switchboard low insulation: find the fault by isolating loads
Procedure
Electrical
·
Low insulation
This is how I find the cause of a low insulation alarm or low reading on the main switchboard (MSB): isolate all loads, then reconnect them one at a time while watching the insulation monitor. It…
Anonymous · 4 y
▲
0
rating
0
comments
HFO to MGO changeover: cool slowly and watch viscosity
Procedure
Main Engine
Changing the main engine and diesel generators from HFO to MGO is safe if fuel temperature falls slowly and viscosity stays between 2 cSt and 20 cSt. This is the general procedure I use; it follows…
Anonymous · 3 y
▲
0
rating
0
comments
Inert gas oxygen analyzers keep failing: a care routine that works
Procedure
Fire & Safety
Inert gas (IG) oxygen analyzers that fail again and again are, in my view, usually handled badly or not maintained correctly; this is the care routine I use to prevent it. Repeated failures with…
Anonymous · 4 y
▲
0
rating
0
comments
BWTS in muddy ports: filters clog, how to ballast and when to bypass
Procedure
Ballast System
Ballasting in very muddy water clogs and can damage the BWTS filter; this note covers how I ballast in those ports and when a bypass is allowed. In my experience this happens mostly in Chinese ports.…
Anonymous · 4 y
▲
0
rating
0
comments
Oil tanker aux boilers: tests before cargo discharge
Procedure
Boiler
Before cargo discharge on an oil tanker, I test the auxiliary boilers so they keep working through the discharge: boiler water, controls, and the pumps under load. This applies to any boiler maker…
Anonymous · 4 y
EngineLog
Home
Cases
Assistant
Library
Log in
Join
Home
Cases
Assistant
Library